Flooring–including both new laminate and tiling, along with grouting and sealing the tile–is finished (well, almost entirely; a very few minor details remain) here at Third World County™ Central. . . except for installing new baseboard and matching trim for doors. *heh* As soon as I have made the new baseboard and trim from raw lumber, that can go in as well. THEN, it’s onto finishing the kitchen remodeling. I’ve had some new ideas about that I needed to think through, but I think I have that pretty well finalized, now. More storage, more usable counter space, better flow: I think I’m going to have some fun with that.
Pictures? Eventually. I may even have a couple of the old counter top, cabinets, etc. (Yeh, replacing some cabinets is gonna be fun, too.)