*heh*
Finally got around to replacing the master bath sink and faucet today. Not such a much; getting A Round To-it was the hardest part, really. Bummed me a wee tad that I couldn’t see my way to having the time all in one chunk to also rip up the counter and put some tile down that I have set aside for that space, but the new fixtures are still a major improvement over the 35-year-old fixtures that were original to the house. *meh* Finally got around to also installing shut-off valves for that sink’s faucet. Yeh, not a single plumbing fixture had shut-off valves as originally installed. . . and as it was when we purchased the place This is the next-to-last. I’ll pencil in some time to do the toilet in that bathroom in the next few days, and that’ll be the last.
Easy gig. Anyone not dumber than a bag of hammers can do it. (That leaves out most high school and college grads nowadays, of course. *sigh*)
Little by little I’m bringing this house not just up to current code but a wee tad beyond. Feels good. Wonder if I’ll live long enough to finish the work? *heh*
Benefits of being an Olde Pharte with juuuust a wee touch of swagger? While I was in the plumbing hardware section at Lowe’s, no one asked me if I needed any help. Good. Because I didn’t. ๐
N.B. Edited out a coupla typos. Left the ones I wanted. *heh*
Here’s your Accomplishment Badge. ๐
*heh*